CertifyELECTRIC sample PDF
Sample EICR report PDF
Look beyond the EICR cover page. Review the existing CertifyELECTRIC sample's installation details, observations and circuit schedules, then judge how clearly your electrical business could present a longer report to its customer.
An access enquiry, not account registration or payment.
Follow the boards, circuits and observations
- Installation identity: check that the client, installation address and report scope identify the work being recorded.
- Board and circuit references: follow the labels through the observations and schedules, especially where circuit numbers repeat on different boards.
- Longer entries: inspect descriptions, limitations and observations across continuation pages, not only the first-page preview.
- Report outcome and declarations: check that the reader can find these without relying on a colour or company logo to explain the conclusion.
- Complete export: review every relevant page at normal reading size before comparing the sample with your own reporting requirements.
Less time explaining the report layout
A customer and the next electrician need to know which board or circuit an observation concerns. During evaluation, use a fictional installation with two boards, repeated circuit numbers under different board references and one longer observation. Follow the references through the exported PDF to judge whether the report is easy to read and hand over.
Use business details and supported branding to identify the issuing contractor, while keeping findings and schedules prominent. The sample shows one presentation. Check the company-logo, colour and layout options available for the exact electrical document and plan; a branded EICR sample does not establish that every certificate or Free starter includes the same controls.
EICR board and circuit schedule guideCompany branding and PDF checklist
CertifyELECTRIC sample questions
Does this EICR sample also demonstrate an EIC or Minor Works certificate?
No. The sample on this page is an Electrical Installation Condition Report. An installation certificate or Minor Works certificate has a different purpose and document scope. Confirm the exact document you intend to issue instead of assuming this example demonstrates every electrical form.
What should I inspect in a longer EICR sample?
Check installation and board identities, circuit references, observations, limitations, continuation pages and declarations. During evaluation, use fictional long entries and follow their references through the whole export. A readable cover page alone is not enough to judge a multi-page report.
Can I add my company logo and choose report colours?
Confirm the branding controls available for your electrical document, app version and plan. Example logos and coloured headings show one presentation, not a promise that custom branding is included in every Free starter. Keep the assessment and schedules readable and use only marks you are entitled to display.
Does the customer need a CertifyELECTRIC account to read the report?
No. The electrician creates the report and sends the exported PDF. The customer can read and retain it without an app account or subscription.
Does this sample prove the layout of every current app build?
No. It is an existing public sample, not a device-by-device or release-by-release verification. Compare an export from the version and plan you intend to use, including long entries and extra pages. The sample contains example data and must not be issued for a real installation.
How do I evaluate CertifyELECTRIC before choosing a plan?
Read the Free starter guide and request access with CertifyELECTRIC selected. Tell the team your device and the electrical documents you need, then confirm the allowance and included features. The enquiry is not account registration or payment; direct signup remains pending.
CertifyPAT
PAT certificate
CertifyGAS
Landlord gas safety record
CertifyFIRE
Fire risk assessment
CertifyLIGHT
Emergency lighting report
CertifyAlarm
Fire alarm verification certificate
CertifyECO
Heat pump installation record
Need access or plan information now? Request help from the team.
Start with your trade app
CertifyELECTRIC